KC 2023 Crushing Project

This contract provides for the manufacturing and stockpiling of Crushed Surfacing Top Course 3/4"-0, Crushed Surfacing Base Course 1 1/4"-0, Ballast, Snow Sand, Cover Stone, Quarry Spalls, Green Diamond Maintenance Rock, and Quarry Spalls in Green Diamond Stockpile in the Fisher Hill Quarry; the manufacturing and stockpiling of Crushed Surfacing Top Course 3/4"-0, Crushed Surfacing Base Course 1 1/4"-0, Snow Sand, and Cover Stone at the Badger Gulch Quarry; the manufacturing and stockpiling of Crushed Surfacing Top Course 3/4"-0, Crushed Surfacing Base Course 1 1/4"-0, Ballast, Snow Sand, and Cover Stone in the Matsen Quarry and other work all in accordance with the Contract PLans, Contract Provisions and the Standard Specifications. Bids received after 12:45 PM November 7, 2023 will not be considered.

Free of charge: Plans, Specifications, addenda, bidders list, and plan holders list for the "KC 2023 Crushing Project" are available through the Klickitat County's online plan room. Free of charge access is provided to Prime Contractors,Subcontractors and Venders by going to Builders Exchange of Washington and clicking on Posted Projects;Public Works; Klickitat County; and Projects Bidding. Bidders are encouraged to "Register" to receive automatic email notification of future addenda and to place themselves on the self registered "Bidders List". This online plan room provides Bidders with fully usable on-line documents; with the ability to: download, print to your own printer, order full/partial plan sets from numerous reprographic sources (online print order form), and a free online digitizer/take-off tool. Contact Builders Exchange of Washington at (425) 258-1303 should you require assistance.