- Home
- Government
- Departments
- Building Department
- Brochures & Handouts
Brochures & Handouts
Brochures
- Building Department Information Brochure (8-18-23)
- Carbon Monoxide Brochure (08-18-23)
- Contractor's License Requirements Brochure (08-18-23)
- Demolition Permit Brochure (08-18-23)
- Manufactured Home Placement Brochure (08-18-23)
- Mechanical-Plumbing Brochure (08-18-23)
- Modular Homes Brochure (08-18-23)
- Renovate Right Brochure (08-18-23)
- Residential Building Permit Information Brochure (08-18-23)
- Special Outbuilding Permit Brochure (08-18-23)
- Window Brochure (08-18-23)
- Yurts Brochure (08-18-23)
Handouts
- ANSI Addendum (2-1-21)
- Backflow Prevention (2-1-21)
- Carbon Monoxide Alarms - 2018
- Demolition Requirements
- Develop Your Dream
- Fence Basics (2-1-21)
- Fire Code Conditions - 2018
- Greenhouse Information
- Inspection Types
- Manufactured Home Testing of System Affidavit (2/24/23)
- Mechanical Installation for Homeowners (2-1-21)
- Metal Carport Kits Handout (2-1-21)
- Mobile-Manufactured Home Basics
- Natural and LP Gas Handout - 2018
- Outdoor Fireplaces
- Plumbing and Trenching for Homeowners - 2018
- Radon Control Methods (Appendix F) - 2018
- Residential Decks and Porches (2-1-21)
- Residential Pools, Spas, Hot tubs, and Saunas
- Residential Re-Roof - 2018
- Residential Solar Energy Systems (2-1-21)
- Solid-Fuel Burning Appliance Provisions - 2018
- Tiny Homes as Temporary Housing vs Permanent Dwelling Units
- Tips for Country Living Booklet
- Unvented Attic Assemblies - 2018
- Water Heaters - 2018
- Well Houses (2-1-21)
-
Building Department
Physical Address
115 W. Court St.
Rm 301
Goldendale, WA 98620
Mailing Address
115 W. Court St.
MS-301
Goldendale, WA 98620
Phone: 509-773-3706Fax: 509-773-2480
Office Hours
Monday - Friday
8 a.m. - 5 p.m.
Call in Hours
Monday - Friday8 a.m. - 4:30 p.m.
Our phone lines shut off at 4:30 p.m. to allow time to prepare the inspector's files for the next day. Inspection requests need to be called in at least 1 day prior. Late requests will be scheduled for the next available inspection day for your area. The inspector does not schedule inspections, and there is no message line. Please plan accordingly.